Gateway was shortlisted as one of three contractors to interview for the TEAGUE project with the architect and the tenant.
Gateway was awarded the project based on our industry knowledge, comprehensive scope summary, and competitive budget estimate. The TEAGUE construction schedule was estimated to be a 15-week project duration and Gateway completed it in 13 weeks. The project consisted of demolishing existing space including walls, flooring, doors, ceiling, plumbing, HVAC, electrical, and the existing stair system.
The design included a new central stair system connecting the fourth and fifth floors. Other design features included; a reclaimed wood panel reception desk with blackened steel cantilevered on multiple edges, significant ceiling cloud installation, upgrades to electrical to accommodate new offices, server room, and tenant’s machinery. Project areas were designed for collaboration & design. A machine shop was built and required strict MEP requirements. Upgrades were made to the structure to accommodate the new open-office plan, stair system, and the occupancy load.

Client | Teague |
Architect | mYamaguchi – Architect |
Type | Office, Historical |
Size6 | 18,705 SF |
Location | 110 Union St #500 Seattle, WA |
Year | 2013 |